VRB News
Virtual Reality Brisbane
  • Home
  • About us
  • IT news
  • Tech
  • World
  • Contact
No Result
View All Result
  • Home
  • About us
  • IT news
  • Tech
  • World
  • Contact
No Result
View All Result
No Result
View All Result
Home IT news

The designers of NPO “Saturn” has received the additional processing power

admin by admin
August 20, 2020
in IT news
0
The designers of NPO “Saturn” has received the additional processing power
0
SHARES
19
VIEWS
Share on FacebookShare on Twitter

The designers of NPO “Saturn” has received additional computing power| 25.08.2008

On Friday, August 22, company “KROK”, IBM company and NPO “Saturn” has announced that it has completed the project on creation of scientific-production Association of a new supercomputer center.

We will remind, in 2005 the design office of NPO “Saturn” for competitive work in the market of gas turbine engines has required a supercomputer. According to the company’s employees today for
successful work on the market, they must reduce the time and costs when creating new products. This requires a significant amount of engineering calculations, modelling, digital experiments, which are
reduce the number of costly trials of natural products. All require significant computing power, which was ordered “Saturn” in 2005.

Then the company “KROK”, IBM and Intel created the enterprise supercomputer based on a cluster of IBM eServer Cluster 1350, which was composed of 64 dual-processor servers IBM eServer xSeries 336 on
64-bit Intel Xeon processors and two 4-socket servers IBM eServer xSeries 455 processor-based Intel Itanium 2.

However, in 2006 the download of the computing power of this cluster is actually close to 100%. So in the middle of last year the NGO has decided that we need to create a new
supercomputer center.

General contractor of the project again became the company “KROK”, who proposed to use the IBM System Cluster 1350, which includes blade servers HS21 on the basis of Quad-core processors Intel
the joint high-speed DDR Infiniband network. The peak performance of the new supercomputer “Saturn” is 14.3 TFlops (this is approximately 20 times more than the same
index previous supercomputer). Work on the creation of this cluster was preceded by a test called the solution center of IBM in Montpellier (France). On the basis of the results obtained
was generated requirements for the new supercomputer.

For the organization of the cluster management enabled BY IBM Cluster Systems Management (CSM), and for the management of the computing tasks FOR IBM Tivoli Workload Scheduler LoadLeveler.

Also in the course of the project to implementing partners had to create NGOs in relevant engineering infrastructure: the system of uninterruptible power supply (based on APC InfraStruXure), system
precision air-conditioning, automatic gas fire extinguishing systems. They are all United, in turn, a centralized monitoring and automation.

A new supercomputer, unlike its predecessor, got its own name — “AL-100” (in honor of the founder NGOs, and designer of engines Arkhip Cradles).

The cost of the project, the company is not known.

Previous Post

Users of Google services are faced with failures

Next Post

The update adds Oculus Quest led digital IPD

admin

admin

Related Posts

How to Grow a YouTube Channel with ScaleLab
IT news

How to Grow a YouTube Channel with ScaleLab: Effective Strategies for Creators

February 4, 2025
Sticker mockups
IT news

Sticker mockups: how to visualize your ideas professionally and efficiently

January 13, 2025
Ways to Get Free Senegal Proxies for Work and Surfing
IT news

Ways to Get Free Senegal Proxies for Work and Surfing

December 24, 2024
Crypto Betting Frontiers
IT news

Crypto Betting Frontiers: The 2025 Landscape

December 6, 2024
iGaming Marketing Trends for 2025
IT news

iGaming Marketing Trends for 2025: Adapting to a Rapidly Changing Landscape

December 5, 2024
Next Post
The update adds Oculus Quest led digital IPD

The update adds Oculus Quest led digital IPD

Premium Content

Push notifications: when they work and when they are annoying

Push notifications: when they work and when they are annoying

July 8, 2020
Where can I play PC games online? Best platforms, multiplayer options.

Where can I play PC games online? Best platforms, multiplayer options.

January 26, 2024
Looking Glass creates 8K new holographic monitor

Looking Glass creates 8K new holographic monitor

August 21, 2020

Browse by Category

  • Games
  • IT news
  • Tech
  • World

VRB News is ready to cooperate with webmasters and content creators. Send an email to info@virtualrealitybrisbane.com

Categories

  • Games
  • IT news
  • Tech
  • World

Recent Posts

  • How to Grow a YouTube Channel with ScaleLab: Effective Strategies for Creators
  • Sticker mockups: how to visualize your ideas professionally and efficiently
  • Ways to Get Free Senegal Proxies for Work and Surfing

© 2023 - The project has been developed ServReality

No Result
View All Result
  • Home
  • About us
  • IT news
  • Tech
  • World
  • Contact

© 2023 - The project has been developed ServReality

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?