VRB News
Virtual Reality Brisbane
  • Home
  • About us
  • IT news
  • Tech
  • World
  • Contact
No Result
View All Result
  • Home
  • About us
  • IT news
  • Tech
  • World
  • Contact
No Result
View All Result
No Result
View All Result
Home IT news

New modular data center MTS in the Leningrad region

admin by admin
October 29, 2020
in IT news
0
New modular data center MTS in the Leningrad region
0
SHARES
42
VIEWS
Share on FacebookShare on Twitter

New modular data center MTS in Leningrad blastogenetic Belas | 29.10.2020

Новый модульный ЦОД МТС в ленинградской области

October 28, in the village of Fedorovskoe (Tosno district of Leningrad region) held a ceremonial commissioning of the modular data center of MTS.

According to the Governor of Leningrad region Alexander Drozdenko, in order to fully realize the project of this data center will need about 16 to 20 MW of electricity. “MTS company our longtime partner,
it helps us to implement the project on provision of social institutions of the Leningrad region with a stable connection, including broadband Internet. This connection is already provided approximately 240 social facilities
our goal this number to increase to 462 social institutions and we will decide in the next year. Our partnership is time-tested, we look forward to continued mutually beneficial
cooperation with MTS,” said Alexander Drozdenko.

img

Then a word took the President of MTS Alexey Root. He said he was very pleased to hold the 27th birthday of MTS in the Leningrad region during the opening of the largest modular data center in the Northwest
Russia. This data center will cover the whole North-West MTS and will provide infrastructure for the region. DPC can achieve the capacity up to 20 MW. “Today we are launching the first phase of the data center power 8
MW, we have allocated capacity to 16 MW. It will be the largest data center in the Northwest. Investment in first data center amounted to 1.8 billion rubles, the second stage will require another 1.2 billion rubles (up to 16
MW), stated Alexey Root. According to him, this is one of the key regions from the point of view of infrastructure for social facilities. MTS has a wide range of digital services for
corporate clients, individuals, state enterprises and institutions.

img

Then answered journalists ‘ questions Alexander Tishkin, head of construction and development of engineering infrastructure of data centers. When building this data center uses a modular principle.
The modules are manufactured at the factory and delivered to the site ready-made, along with racks, panel Board equipment, uninterruptible power supply.

img

Today, the forum was launched two modules of 900 kW useful IT load. Each module can contain up to 120 server racks filled with equipment, the power consumption of each
server rack is from 7 to 18 kW. The main essence of data center failover and continuity, resiliency of the data center is – 99,99982, which corresponds to
1.4 hours of unplanned downtime per year. The new data center has passed two certifications of the international organization the Uptime Institute. In the first stage is certified by the project documentation, the second
stage – ready built data center. This data center is certified tier 3. Currently implemented modules and future plans include the installation of two more modules. MTS is now firmly
considering the possibility of building one of the two modules for the colocation. Today in advanced modules will work app Cloud, M2M, IoT.

img

Since electrical power is already supplied, and for the following two modules, then the next module can be completed within 6 months. In addition, about 1-2 months is spent
certified by the Uptime Institute. In the next 1-2 years can be commissioned in all 4 modules. This is the second data center, MTS, built on a modular technology, early data centers were built MTS landline
and implemented in existing buildings. Platform for modular data centers are chosen with great potential for power generation. MTS new data center switched to using propylene glycol in
refrigeration systems, in addition to this, it is clean and environmentally friendly gas Novec 1230. In addition, in the form of pilot projects by MTS was implemented adiabatic module
which uses technology natural free cooling, i.e. in the same data center even there are no compressors and used outdoor air passing through the heat exchanger.

img

This is a private development of MTS. Since the data center certified by Uptime Institute, the pilot project considered a success.

At MTS this data center is the 11th, the average data Center life cycle is 15-20 years. Usually 7-10 years is reengineering – i.e. the adaptation of the data center under advanced equipment. What
for new sites, it is already comparable in strength to the construction of the data center in the Siberian Federal district, the DPC will be launched next year. Also, according to Alexander Tishkin goes
selection of sites in the southern Federal district.

Data center

Journal: Journal IT-News, Subscription to magazines

MTS | MTS

Previous Post

What is the Chinese Ant Group Jack MA ahead of an IPO?

Next Post

DvG — David vs Goliath in VR

admin

admin

Related Posts

How to Grow a YouTube Channel with ScaleLab
IT news

How to Grow a YouTube Channel with ScaleLab: Effective Strategies for Creators

February 4, 2025
Sticker mockups
IT news

Sticker mockups: how to visualize your ideas professionally and efficiently

January 13, 2025
Ways to Get Free Senegal Proxies for Work and Surfing
IT news

Ways to Get Free Senegal Proxies for Work and Surfing

December 24, 2024
Crypto Betting Frontiers
IT news

Crypto Betting Frontiers: The 2025 Landscape

December 6, 2024
iGaming Marketing Trends for 2025
IT news

iGaming Marketing Trends for 2025: Adapting to a Rapidly Changing Landscape

December 5, 2024
Next Post
DvG — David vs Goliath in VR

DvG — David vs Goliath in VR

Premium Content

Sony contemplates the possibility of watching games through mixed reality Sent by the community

Sony contemplates the possibility of watching games through mixed reality Sent by the community

November 19, 2021
Creating the gateway service in the Initializr.

Routing and Filtering with Spring Cloud Gateway

March 11, 2022
Alexis Ohanian left Reddit Board of Directors and offered to replace yourself black

Alexis Ohanian left Reddit Board of Directors and offered to replace yourself black

June 12, 2020

Browse by Category

  • Games
  • IT news
  • Tech
  • World

VRB News is ready to cooperate with webmasters and content creators. Send an email to info@virtualrealitybrisbane.com

Categories

  • Games
  • IT news
  • Tech
  • World

Recent Posts

  • How to Grow a YouTube Channel with ScaleLab: Effective Strategies for Creators
  • Sticker mockups: how to visualize your ideas professionally and efficiently
  • Ways to Get Free Senegal Proxies for Work and Surfing

© 2023 - The project has been developed ServReality

No Result
View All Result
  • Home
  • About us
  • IT news
  • Tech
  • World
  • Contact

© 2023 - The project has been developed ServReality

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?